拉苏瓦布特科西水电站项目(120MW)Rasuwa Bhotekoshi Hydropower Project(120MW)
    发布时间: 2020-07-09 11:46    

拉苏瓦布特科西水电项目位于尼泊尔西北部边境拉苏瓦地区,中尼吉隆边境口岸布特科西河上,从吉隆口岸通往尼泊尔首都加德满都和主要城市博卡拉的干道公路连接起项目首部和厂区。       
More>>

拉苏瓦布特科西水电站项目(120MW)Rasuwa Bhotekoshi Hydropower Project(120MW)

拉苏瓦布特科西水电项目位于尼泊尔西北部边境拉苏瓦地区,中尼吉隆边境口岸布特科西河上,从吉隆口岸通往尼泊尔首都加德满都和主要城市博卡拉的干道公路连接起项目首部和厂区。
Rasuwa Bhotekoshi Hydropower Project is located on Bhotekoshi river near the border of Gyirong port between China and Nepal. A highway, starting from Gyirong port to Kathmandu,the capital of Nepal, and the main city of Porkhara, enables access to the head work and the powerhouse area.

水电站装机容量120MW(3×40MW),设计流量86.75m3/s,净水头164.21m,多年平均发电量692GWh。电站建成后所生产的电能通过5公里长的220kv输电线接入位于Rasuwa地区的Chilime变电站并入尼泊尔国家电网,该部分电力主要供给尼泊尔中部地区。
The Project has an installed capacity of 120MW (3×40MW), with a designed discharge of 86.75m3/s and a net head of 164.21m. Its average annual electricity generation is 692GWh. After completion, the electricity generated by the station is transmitted through a 5-kilometer-long 220kV transmission line to the Chilime substation located in the Rasuwa region and integrated into the national grid of Nepal. This portion of electricity mainly serves the central region of Nepal.

拉苏瓦·布特科西水电站作为中国对尼水电投资较大的项目之一,得到了中国驻尼大使馆与经参处、尼泊尔政府的大力支持和赞赏。2017年被纳入四川省“一带一路”重点项目库。电站总投资23521.44万美元,该电站均采用“中国标准,中国技术、中国设备、中国管理”的全产业链模式,由中国水利水电第七工程局有限公司EPC总承包,中国电建昆明勘测院设计,山东省淮海工程建设监理有限公司承担监理工作。已于2021年1月1日全面开工,目前正在全力推进项目贷款的完成。该电站的建设带动了当地建筑、运输、钢材、水泥等行业的快速兴起,对促进尼泊尔当地社会经济的发展发挥重要作用。
As one of China's significant investments in hydroelectric projects in Nepal, Rasuwa Project has received strong support and appreciation from the Chinese Embassy and Economic and Commercial Counsellor's Office in Nepal, as well as the Nepalese government. In 2017, it was included in the key project library of the "Belt and Road" initiative of Sichuan Province, China.The total investment in the project amounts to 235.2144 million US dollars. It adopts a complete industry chain model of "Chinese standards, Chinese technology, Chinese equipment, and Chinese management." And it’s executed under the EPC (Engineering, Procurement, and Construction) contract by the Sinohydro Bureau 7 Co.,LTD ,designed by the Powerchina Kuming Engineering Corporation Limited, and supervised by the Shandong Huaihai Engineering Construction Supervision Co., Ltd. Construction commenced comprehensively on January 1, 2021, and efforts are currently underway to complete the project financing.
The construction of the station has stimulated the rapid development of local industries such as construction, transportation, steel, and cement, playing a significant role in promoting the socio-economic development of Nepal.





拉苏瓦项目俯视图